Integrated Science 2 - Spring 2010 Daily Agendas

Pre Science Fair Unit

| SKIP TO CURRENT WEEK |

Click On Any Link To View The Associated Curriculum

| Integrated Science 1-2 Course Overview | Table Of Contents (blank) | Binder Grading Sheet (blank) |

 

IS 2 - WEEK 14

[STAR TESTING WEEK]

Mon. 4/19

1. Return Bacteria Lab Reports

            ¥ important to review mistakes made,

especially as it relates to the use of the Design Outline, and the Formal Lab Report format

2. Pre-Science Fair Unit and Project Introduction

            ¥ overview (the big picture – thru January 2010, and beyond for some students)

3. Review Past Science Fair Projects On-Line
            ¥ science department web-site

 

HW:    1. REVIEW GRADED BACTERIA LAB – REVIEW YOUR MISTAKES

[CHECK REFERENCE SECTION OF YOUR BINDER]

2. PRE-READ ÒIS2 SCIENCE FAIR ASSIGNMENTÓ

 

Tue. 4/20 [40 minute periods: 1, 3, 5, 7]

1. Quick Check-In: Science Fair Project Handout ÒIS2 Science Fair AssignmentÓ

2. ÒGenerating IdeasÓ

2. Design Outline is due next Monday

            ¥ blank Design Outline available (very fast download – Word doc)

HW:    WORK ON ÒGENERATING IDEASÓ – DUE THURSDAY

HAVING TROUBLE: COME TO OFFICE HOURS – THIS WEEK ITÕS WED. NOT THURSDAY

 

Thu. 4/22 [50 minute periods: 1, 3, 5, 7]

1. ÒGenerating IdeasÓ and Topic Approval (each student needs to have their topic recorded)

 

 

HW:    DESIGN OUTLINE (based on approved topic) and 3 Articles


IS 2 - WEEK 15

 

Mon. 4/26

1. Design Outline and 3 Articles Due (each student has their work checked)
2. Begin Working On ÒProof of ResearchÓ Worksheet
            ¥ only for students who have had their Design Outline and Articles checked-off

 

HW:    1. PROOF OF RESEARCH DUE WEDNESDAY

            2. BRING MATERIALS NEEDED TO WORK ON INTRODUCTION

 

 

Tue. 4/28

1. Work Day

            ¥ catch-up, or work on proof of research, or move ahead and work on Intro. Section Worksheet

            ¥ ÒIntroduction Section WorksheetÓ available

 

 

Block Day

1. Proof of Research Checked

2. Review Introduction Section

¥ Begin Working On ÒIntroduction Section WorksheetÓ

 

HW:    TYPED DRAFT OF INTRODUCTION SECTION

 

 

Fri. 5/30

1. Typed Introduction Due

            ¥ peer review session | handout | *each introduction gets peer reviewed twice

2. For Those Who Have Completed the Introduction Draft

            ¥ begin drafting sections C, D, and/or E

 

HW:    1. INTRODUCTION PEER REVIEW, INTRODUCTION DRAFT, AND INTRO REVISION (DUE MON.)

2. COMPLETE PRE-SCIENCE FAIR DRAFT A-E DUE NEXT WEDNESDAY


IS 2 - WEEK 16

Mon. 5/3

1. Homework Check

2. Makeup Day For Students Who Did Not Get A Peer Review Done Last Friday

3. Work Day

 

 

Tue. 5/4

1. Work Day

2. Review Cover Page

 

HW:    1. COMPLETE PRE-SCIENCE FAIR DRAFT A-E DUE WEDNESDAY

 

 

Block Day

1. Peer Review of Sections B, C, D and E

            ¥ peer review (2 reviews, self-evaluation, and reflection)
            ¥ peer review sheet presented for credit

 

HW: TYPED FINAL DRAFT OF COVER SHEET, AND SECTIONS A-E5

 

Fri. 5/7

1. Complete Pre-Science Fair Report Due

2. Disease Project Introduction

            ¥ brief overview

            ¥ Project Handout

            ¥ Group and Topic Assignments | 3rd | 5th |

3. Move To Computer Lab 182: day one work on disease project (PowerPoint file)

            ¥ Meet In Room 182 on Monday